"1823 General view of progress on the High Mix concrete Plant, and Head Tower for No. 9 Cableway. December 20th, 1932.
1841 High Mix concrete plant and Head Tower for No. 9 Cableway. January Jth, 1933.
1846 Lower Portals of the Diversion Tunnels, and excavation in the river bottom, for Downstream Cofferdam and Rock Barrier. January 6 th, 1933.
1847 Excavation operations for Downstream Cofferdam. January 6th, 1933."
black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Digital Format
TIFF/JPG/PDF
Digitization Specifications
Archived TIFF images were scanned by Jill Walker at 400 dpi with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use.
Digital Image Copyright 2008. Materials may be used for non-profit and educational purposes, please credit the Special Collections Department, Stewart Library, Weber State University.