"1277 Steel forms for lining the arch sections of the diversion tunnels were erected on the muck-fill on the Nevada side of the river. June 18th, 1932.
1235 Section of the arch jumbo form being transported across the river by overhead cableway. Note the workman on top of the form. June 10th, 1932.
1278 Forms were constructed in 11-foot sections and transported to the Arizona side by overhead cableways. June 18th, 1932.
"
black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Digital Format
TIFF/JPG/PDF
Digitization Specifications
Archived TIFF images were scanned by Jill Walker at 400 dpi with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use.
Digital Image Copyright 2008. Materials may be used for non-profit and educational purposes, please credit the Special Collections Department, Stewart Library, Weber State University.