"3269 Boulder Dam, looking downstream from the Arizona side. May 27th, 1935.
3296 Boulder Dam, looking downstream from the Nevada side, showing Spillways and the Intake Towers. June 1st, 1935.
3284 Looking in a general downstream direction, on the Arizona Black Canyon Highway, showing Six Companies Inc.
road work. May 27th, 1935.
3303 View of the open cut portion of the Switchyard Control Circuit Tunnel. Shovel is excavating for the Switchyard, and the building in the foreground is the power sub-station. The Babcock and Wilcox Company plant can be seen in the extreme background June 1st, 1935"
black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Digital Format
TIFF/JPG/PDF
Digitization Specifications
Archived TIFF images were scanned by Kathleen Broeder at 400 dpi with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use.
Digital Image Copyright 2008. Materials may be used for non-profit and educational purposes, please credit the Special Collections Department, Stewart Library, Weber State University.